Monday, March 24, 2008

Some important points in CP implementation on Energy application. Can You suggest more?

• Installing sensors to turn off or power down lights and machineries when they are not in use
• Proper insulation on heating and cooling systems and pipe networks.
• Using more energy-efficient equipment
• Continuous maintenance aiming optimize energy usage in equipments
• Ensuring optimal combustion in hot water boilers and steam boilers
• Eliminate steam and condensate leakages and discharges. (Do not waste condensate, it contain more heat comparatively to make up water of the boiler)
• Using low-grade energy for use elsewhere in operation, such as using furnace emissions to heat up make up water stream.

Are there more options? Can you suggest with your experiences?

No comments:

Followers